A good shipping plan begins before production. Product type, packing method, route limitations and site unloading all affect the final load plan.
Confirm the packed dimensions
Ask for the packed size and gross weight of each package, not only the finished building size. This is essential for container utilization and site lifting plans.
Match the package to site access
The destination team should know whether a forklift, crane or manual assembly crew is required. Access roads and unloading space should be checked before shipment.
Keep documents aligned
The commercial invoice, packing list, component labels and installation information should all use the same module references so the receiving team can work efficiently.
Every modular project has different structural, climate and regulatory needs. Use this guide as a starting point, then confirm the final specification for your destination and intended use.
Discuss your project ↗